Site Constraints Register
Site evidence becomes a traceable register: constraint, source, extent, confidence, and the decision it blocks.
38 skills we built for our own practice, packaged so you can install them in minutes. Each one takes the material you already have — a brief, a transcript, a DXF, a tender, a drawing set, an IFC — and returns something you can issue. None of them invent a figure, a clause or a standard: what the evidence does not support stays visibly blank.
These skills assist qualified practitioners. They replace neither the architect of record nor the approving authority. Every figure, clause and citation they surface is marked for you to verify — treat an unverified output as a question, not an answer.
Four parts of the week. Pick the one you are in.
Constraints, planning policy, daylight screening.
5Briefs, reports, minutes, site visits, schedules.
3Area audits, occupancy, adjacency matrices.
7Hero shots, facade studies, site diagrams, film, maps.
3Register audits, spec cross-checks, callouts.
2Access checks and CAD file forensics.
3Embodied carbon, EPDs, overheating packs.
4RFIs, progress reports, changes, fee proposals.
5Tenders, proposals, decks, market and pipeline research.
3IFC audits, CRS reconciliation, engine handover.
A skill is a folder of instructions Claude reads when the conversation matches. No API key, no plugin, nothing to configure.
Open any skill below and download its .skill file — a zip of the instructions
and reference material, usually under 20 KB.
Drop the .skill file into a Claude conversation and save it, or unzip the
folder into .claude/skills/ for Claude Code.
It loads itself when your conversation matches. Where a skill bundles a worked example, run it on that first and score the result against the defect key.
Every one shares the same discipline: a confident wrong figure is indistinguishable from a right one once it is in a file.
19 skills
Site evidence becomes a traceable register: constraint, source, extent, confidence, and the decision it blocks.
Policy documents become a clause-by-clause extract with the modal verb preserved and the force of each requirement marked.
Scopes the assessment a consultant will run: which receptors, which methodology, what geometry is needed.
A client brief becomes a traceable requirements register, schedule of accommodation and query sheet.
A long report becomes a one-page summary in which the caveats survive and conflicting figures are never quietly reconciled.
A transcript becomes minutes that separate decisions from discussion and flag verbal instructions and scope creep.
Site photos and narration become an observation report where visible and inferred are tagged differently.
A photo of a schedule becomes a faithful .xlsx — original order kept, unreadable cells flagged, printed totals never corrected.
Recomputes every total, finds mixed measurement bases and unit drift, and reconciles the mix against the brief.
Plans become a measuring and query sheet for the fire engineer, with every code figure left as a named clause.
A brief becomes a relationship matrix where every rating is traced and every unstated pair stays visibly blank.
Project material becomes a hero-shot brief and prompt variants. The design is fixed; the camera is what varies.
A facade intent pack becomes coordinated bay, material and proportion study prompts. The camera is fixed; the cladding is what varies.
General Gemini / Nano Banana prompt engineering for archviz, including edit and transform chains.
Project assets become a shot list with timings, camera moves and per-clip video prompts.
A site becomes four coordinated analysis figures: roads, buildings, greenery, radius rings. One moment, four layers.
A site becomes a six-frame concept evolution, with A/B/C options at each frame. You choose before it moves on.
Site data becomes one self-contained interactive HTML map, with unverified layers visibly dashed.
Reconciles register, title block and filename — the three sources that are supposed to agree and routinely do not.
Every specified item traced to the drawings and back, with orphans both ways and conflicts quoted side by side.
Resolves the cross-reference graph of a technical package: dangling callouts, orphan details, and junctions drawn nowhere.
A drawing becomes a measuring worksheet: what to check, where, against which AD M clause. You record the finding.
Verdict-first forensics on a CAD file: units, scale, origin, layers, blocks, hygiene. The file is evidence and is never modified.
An auditable quantity register for a carbon assessment, with scope written first and every factor slot left empty.
Pulls declared data out of EPDs and compares only the pairs that genuinely compare, with the reason named for the rest.
Assembles what a thermal modeller needs — including whether the windows can actually be opened.
Triages RFIs by what they actually are, and drafts only the ones the issued documents already answer.
A month's material becomes a draft client report — assembled from sources, never recalled, with risk movement visible.
Finds the moments in correspondence where a change may have been created, and quotes the exact sentence.
Scope in deliverables, exclusions written as carefully as inclusions, and a build-up from your own rates only.
An incoming ITT becomes dates, scope, submission mechanics, easy misses and the go/no-go decision. Run it before you respond.
RFP plus practice material becomes a response draft with a compliance matrix. Gaps stay [TBC] rather than becoming invented credentials.
A project pack becomes a real .pptx pitch deck with image placeholders and an internal gap slide.
A sector and geography become developer profiles with a citation slot on every line. Nothing from memory.
An area becomes a planning pipeline with precise status language — validated is not approved — and a cited source per claim.
Verdict-first forensics on an IFC: georeferencing, spatial structure, property coverage and GlobalId stability. Never modified.
Every dataset's CRS, datum, units and origin in one register — with the symptom each disagreement would produce.
What a real-time engine actually needs, checked before anyone exports: placement, identity, weight, materials.
Nothing matches that.
Because the same failure keeps costing money: a confident wrong figure is indistinguishable from a right one once it is in a file. A clean-looking output is usually the failure mode.
Room sizes, clearances, policy figures — the document and clause get named and marked [to verify]. The skill never supplies the number.
Stated, inferred and assumed are tagged differently and never merged. An assumption that reads as a fact is the expensive kind.
Two contradictory figures both get quoted with their locations. Choosing between them is yours.
m² and ft², GIA and NIA, are flagged, never reconciled.
No massing, no test-fits, no recommendations dressed as analysis, no compliance verdicts.
No web-searching the client or site unless asked; no client names in output filenames.
A thin brief should produce a thin register and a long query sheet. That is the correct answer, not a failure.
We build the same discipline into digital twins, Revit and Rhino pipelines and Unreal front ends. Tell us what the week actually looks like.